The project entails the construction of a 2 storey office building (27,000sq ft) of mainly concrete sub & superstructure with a structural steel roof frame. The shell consists mainly of Curtain walling & glazing to all elevations, self coloured render finishes to the rear & gables of the building & granite cladding to the front elevation.
The internal finishes include the construction of stud partitioning & dry wall with painted & tiled finishes. The ceilings are suspended grid & plaster board & the floors are raised floor construction with tiled, carpet & wood flooring finishes. The project also includes for the M&E, AV & lift installations.
The external site works consist of the construction of all underground services with a foul pumping station out side the site boundary lines. The construction of a 150 space car-park, landscaping, external road widening, site attenuation pond, brick-paving & asphalt road ways
Project Details:
Client: Horse Racing Ireland Location: Curragh, Newbridge, Co. Kildare Consultants: Todd Architects, RPS Environmental Engineering, Varming Mulcahy Reilly Associates, Bruce Shaw Partnership Project Value: € 9 Million Completion Date: October 2007